| التشطيبات المعمارية والأعمال الكهرو ميكانيكية |
Minya Branch
El Hossary Branch – 6th October City
فرع بريمافيستا – 6 أكتوبر
فرع الغردقة
Wastani Petroleum Fields in Damietta
The construction of the restaurant building – the finishes of the administrative building – the finishing of the accommodation building for the workers – the finishes of the medical clinic building – the finishes of the laboratory building – the fire alarm systems in both the administrative and residential buildings and the sample analysis laboratory – the sound system in the conference hall









